            03    <navigation enabled="True" position="Top" size="30"> 
    
 
    
        
            04      <buttons collapse_expand_button="true" align="Far" /> 
    
 
    
        
            05      <text><![CDATA[Activity-Oriented Chart]]></text> 
    
 
    
        
            06      <font face="Verdana" size="10" bold="true" color="White" /> 
    
 
    
        
            08        <fill type="Gradient"> 
    
 
    
        
            10            <key color="#B0B0B0" position="0" /> 
    
 
    
        
            11            <key color="#A0A0A0" position="0.3" /> 
    
 
    
        
            12            <key color="#999999" position="0.5" /> 
    
 
    
        
            13            <key color="#A0A0A0" position="0.7" /> 
    
 
    
        
            14            <key color="#B0B0B0" position="1" /> 
    
 
    
        
            17        <border type="Solid" color="#494949" /> 
    
 
    
        
            20    <background enabled="false" /> 
    
 
    
        
            23    <scale show_start="2000.1.24 0.0" show_end="2000.2.28 0.0"> 
    
 
    
        
            24      <zoom allow_animation="false" /> 
    
 
    
        
            29      <task id="1" name="Phase 1 - Strategic Plan" parent="" progress="14%" actual_start="2000.1.24 0.0" actual_end="2000.2.28 0.0" /> 
    
 
    
        
            30      <task id="2" name="Self-Assessment" parent="1" progress="25%" actual_start="2000.1.24 0.0" actual_end="2000.2.2 0.0" /> 
    
 
    
        
            31      <task id="3" name="Define business vision" parent="2" progress="0%" actual_start="2000.1.24 16.0" actual_end="2000.1.25 1.0" /> 
    
 
    
        
            32      <task id="4" name="Identify available skills, information and support" parent="2" progress="0%" actual_start="2000.1.25 16.0" actual_end="2000.1.26 1.0" /> 
    
 
    
        
            33      <task id="5" name="Decide whether to proceed" parent="2" progress="0%" actual_start="2000.1.28 16.0" actual_end="2000.1.29 1.0" /> 
    
 
    
        
            34      <task id="6" name="Define the Opportunity" parent="1" progress="27%" actual_start="2000.1.29 0.0" actual_end="2000.2.14 0.0" /> 
    
 
    
        
            35      <task id="7" name="Research the market and competition" parent="6" progress="0%" actual_start="2000.1.29 16.0" actual_end="2000.2.1 1.0" /> 
    
 
    
        
            36      <task id="8" name="Interview owners of similar businesses" parent="6" progress="60%" actual_start="2000.2.1 0.0" actual_end="2000.2.8 0.0" /> 
    
 
    
        
            37      <task id="9" name="Identify needed resources" parent="6" progress="0%" actual_start="2000.2.8 16.0" actual_end="2000.2.10 1.0" /> 
    
 
    
        
            38      <task id="10" name="Identify operating cost elements" parent="6" progress="0%" actual_start="2000.2.10 16.0" actual_end="2000.2.14 1.0" /> 
    
 
    
        
            39      <task id="11" name="Evaluate Business Approach" parent="1" progress="0%" actual_start="2000.2.14 16.0" actual_end="2000.2.18 1.0" /> 
    
 
    
        
            40      <task id="12" name="Define new entity requirements" parent="11" progress="0%" actual_start="2000.2.14 16.0" actual_end="2000.2.15 1.0" /> 
    
 
    
        
            41      <task id="13" name="Identify on-going business purchase opportunities" parent="11" progress="0%" actual_start="2000.2.15 16.0" actual_end="2000.2.16 1.0" /> 
    
 
    
        
            42      <task id="14" name="Research franchise possibilities" parent="11" progress="0%" actual_start="2000.2.16 16.0" actual_end="2000.2.17 1.0" /> 
    
 
    
        
            43      <task id="15" name="Summarize business approach" parent="11" progress="0%" actual_start="2000.2.17 16.0" actual_end="2000.2.18 1.0" /> 
    
 
    
        
            44      <task id="16" name="Evaluate Potential Risks and Rewards" parent="1" progress="0%" actual_start="2000.2.15 16.0" actual_end="2000.2.25 1.0" /> 
    
 
    
        
            45      <task id="17" name="Assess market size and stability" parent="16" progress="0%" actual_start="2000.2.15 16.0" actual_end="2000.2.17 1.0" /> 
    
 
    
        
            46      <task id="18" name="Estimate the competition" parent="16" progress="0%" actual_start="2000.2.17 16.0" actual_end="2000.2.18 1.0" /> 
    
 
    
        
            47      <task id="19" name="Assess needed resource availability" parent="16" progress="0%" actual_start="2000.2.22 16.0" actual_end="2000.2.24 1.0" /> 
    
 
    
        
            48      <task id="20" name="Evaluate realistic initial market share" parent="16" progress="0%" actual_start="2000.2.24 16.0" actual_end="2000.2.25 1.0" /> 
    
 
    
        
            49      <task id="21" name="Determine financial requirements" parent="16" progress="0%" actual_start="2000.2.20 16.0" actual_end="2000.2.22 1.0" /> 
    
 
    
        
            50      <task id="22" name="Review personal suitability" parent="16" progress="0%" actual_start="2000.2.22 16.0" actual_end="2000.2.23 1.0" /> 
    
 
    
        
            51      <task id="23" name="Evaluate initial profitability" parent="16" progress="0%" actual_start="2000.2.23 16.0" actual_end="2000.2.24 1.0" /> 
    
 
    
        
            52      <task id="24" name="Review and modify the strategic plan" parent="1" progress="0%" actual_start="2000.2.24 16.0" actual_end="2000.2.28 2.0" /> 
    
 
    
        
            53      <task id="25" name="Confirm decision to proceed" parent="1" progress="0%" actual_start="2000.2.28 2.0" actual_end1="2000.2.28 2.0" /> 
    
 
    
        
            54      <task id="26" name="Phase 2 - Define the Business Opportunity" parent="" progress="19%" actual_start="2000.2.28 0.0" actual_end="2000.4.3 0.0" /> 
    
 
    
        
            55      <task id="27" name="Define the Market" parent="26" progress="28%" actual_start="2000.2.28 0.0" actual_end="2000.3.14 0.0" /> 
    
 
    
        
            56      <task id="28" name="Access available information" parent="27" progress="0%" actual_start="2000.2.28 17.0" actual_end="2000.2.29 2.0" /> 
    
 
    
        
            57      <task id="29" name="Create market analysis plan" parent="27" progress="0%" actual_start="2000.2.29 17.0" actual_end="2000.2.31 2.0" /> 
    
 
    
        
            58      <task id="30" name="Implement market analysis plan" parent="27" progress="40%" actual_start="2000.2.31 0.0" actual_end="2000.3.7 0.0" /> 
    
 
    
        
            59      <task id="31" name="Identify competition" parent="27" progress="60%" actual_start="2000.3.7 0.0" actual_end="2000.3.11 0.0" /> 
    
 
    
        
            60      <task id="32" name="Summarize the market" parent="27" progress="0%" actual_start="2000.3.11 17.0" actual_end="2000.3.13 2.0" /> 
    
 
    
        
            61      <task id="33" name="Identify target market niche" parent="27" progress="0%" actual_start="2000.3.13 17.0" actual_end="2000.3.14 2.0" /> 
    
 
    
        
            62      <task id="34" name="Identify Needed Materials and Supplies" parent="26" progress="0%" actual_start="2000.3.13 17.0" actual_end="2000.3.22 2.0" /> 
    
 
    
        
            63      <task id="35" name="Select a business approach (from "Evaluate Business Approach" above)" parent="34" progress="0%" actual_start="2000.3.13 17.0" actual_end="2000.3.15 2.0" /> 
    
 
    
        
            64      <task id="36" name="Identify management staff resources" parent="34" progress="0%" actual_start="2000.3.17 17.0" actual_end="2000.3.18 2.0" /> 
    
 
    
        
            65      <task id="37" name="Identify staffing requirements" parent="34" progress="0%" actual_start="2000.3.18 17.0" actual_end="2000.3.19 2.0" /> 
    
 
    
        
            66      <task id="38" name="Identify needed raw materials" parent="34" progress="0%" actual_start="2000.3.19 17.0" actual_end="2000.3.20 2.0" /> 
    
 
    
        
            67      <task id="39" name="Identify needed utilities" parent="34" progress="0%" actual_start="2000.3.20 17.0" actual_end="2000.3.21 2.0" /> 
    
 
    
        
            68      <task id="40" name="Summarize operating expenses and financial projections" parent="34" progress="0%" actual_start="2000.3.21 17.0" actual_end="2000.3.22 2.0" /> 
    
 
    
        
            69      <task id="41" name="Evaluate Potential Risks and Rewards" parent="26" progress="17%" actual_start="2000.3.24 0.0" actual_end="2000.4.2 0.0" /> 
    
 
    
        
            70      <task id="42" name="Assess market size and stability" parent="41" progress="50%" actual_start="2000.3.24 0.0" actual_end="2000.3.26 0.0" /> 
    
 
    
        
            71      <task id="43" name="Assess needed resources availability" parent="41" progress="0%" actual_start="2000.3.26 17.0" actual_end="2000.3.28 2.0" /> 
    
 
    
        
            72      <task id="44" name="Forecast financial returns" parent="41" progress="0%" actual_start="2000.3.28 17.0" actual_end="2000.4.2 2.0" /> 
    
 
    
        
            73      <task id="45" name="Review and modify the business opportunity" parent="26" progress="0%" actual_start="2000.4.2 17.0" actual_end="2000.4.3 2.0" /> 
    
 
    
        
            74      <task id="46" name="Confirm decision to proceed" parent="26" progress="0%" actual_start="2000.4.3 2.0" actual_end="2000.4.3 2.0" /> 
    
 
    
        
            75      <task id="47" name="Phase 3 - Plan for Action" parent="" progress="17%" actual_start="2000.4.3 0.0" actual_end="2000.5.1 0.0" /> 
    
 
    
        
            76      <task id="48" name="Develop Detailed 5-Year Business Plan" parent="47" progress="17%" actual_start="2000.4.3 0.0" actual_end="2000.5.1 0.0" /> 
    
 
    
        
            77      <task id="49" name="Describe the vision and opportunity" parent="48" progress="0%" actual_start="2000.4.3 17.0" actual_end="2000.4.4 2.0" /> 
    
 
    
        
            78      <task id="50" name="List assumptions" parent="48" progress="0%" actual_start="2000.4.4 17.0" actual_end="2000.4.5 2.0" /> 
    
 
    
        
            79      <task id="51" name="Describe the market" parent="48" progress="0%" actual_start="2000.4.5 17.0" actual_end="2000.4.6 2.0" /> 
    
 
    
        
            80      <task id="52" name="Describe the new business" parent="48" progress="0%" actual_start="2000.4.8 17.0" actual_end="2000.4.9 2.0" /> 
    
 
    
        
            81      <task id="53" name="Describe strengths, weaknesses, assets and threats" parent="48" progress="0%" actual_start="2000.4.9 17.0" actual_end="2000.4.10 2.0" /> 
    
 
    
        
            82      <task id="54" name="Estimate sales volume during startup period" parent="48" progress="0%" actual_start="2000.4.10 17.0" actual_end="2000.4.11 2.0" /> 
    
 
    
        
            83      <task id="55" name="Forecast operating costs" parent="48" progress="0%" actual_start="2000.4.11 17.0" actual_end="2000.4.12 2.0" /> 
    
 
    
        
            84      <task id="56" name="Establish pricing strategy" parent="48" progress="0%" actual_start="2000.4.12 17.0" actual_end="2000.4.13 2.0" /> 
    
 
    
        
            85      <task id="57" name="Forecast revenue" parent="48" progress="0%" actual_start="2000.4.15 17.0" actual_end="2000.4.16 2.0" /> 
    
 
    
        
            86      <task id="58" name="X" parent="48" progress="0%" actual_start="2000.4.16 17.0" actual_end="2000.4.18 2.0" /> 
    
 
    
        
            87      <task id="59" name="Develop break-even analysis" parent="48" progress="0%" actual_start="2000.4.18 17.0" actual_end="2000.4.19 2.0" /> 
    
 
    
        
            88      <task id="60" name="Develop cash-flow projection" parent="48" progress="0%" actual_start="2000.4.19 17.0" actual_end="2000.4.20 2.0" /> 
    
 
    
        
            89      <task id="61" name="Identify licensing and permitting requirements" parent="48" progress="0%" actual_start="2000.4.22 17.0" actual_end="2000.4.23 2.0" /> 
    
 
    
        
            90      <task id="62" name="Develop startup plan" parent="48" progress="100%" actual_start="2000.4.23 17.0" actual_end="2000.4.25 2.0" /> 
    
 
    
        
            91      <task id="63" name="Develop sales and marketing strategy" parent="48" progress="0%" actual_start="2000.4.25 17.0" actual_end="2000.4.26 2.0" /> 
    
 
    
        
            92      <task id="64" name="Develop distribution structure" parent="48" progress="0%" actual_start="2000.4.26 17.0" actual_end="2000.4.27 2.0" /> 
    
 
    
        
            93      <task id="65" name="Describe risks and opportunities" parent="48" progress="20%" actual_start="2000.4.29 0.0" actual_end="2000.4.31 0.0" /> 
    
 
    
        
            94      <task id="66" name="Publish the business plan" parent="48" progress="0%" actual_start="2000.4.31 17.0" actual_end="2000.5.1 2.0" /> 
    
 
    
        
            95      <task id="67" name="Confirm decision to proceed" parent="48" progress="0%" actual_start="2000.5.1 2.0" actual_end="2000.5.1 2.0" /> 
    
 
    
        
            96      <task id="68" name="Phase 4 - Proceed With Startup Plan" parent="" progress="24%" actual_start="2000.5.1 0.0" actual_end="2000.7.24 0.0" /> 
    
 
    
        
            97      <task id="69" name="Choose a location" parent="68" progress="36%" actual_start="2000.5.1 0.0" actual_end="2000.5.2 0.0" /> 
    
 
    
        
            98      <task id="70" name="Establish Business Structure" parent="68" progress="14%" actual_start="2000.5.2 0.0" actual_end="2000.6.11 0.0" /> 
    
 
    
        
            99      <task id="71" name="Choose a Name" parent="70" progress="33%" actual_start="2000.5.2 0.0" actual_end="2000.5.6 0.0" /> 
    
 
    
        
            100      <task id="72" name="Identify implications" parent="71" progress="40%" actual_start="2000.5.2 0.0" actual_end="2000.5.3 0.0" /> 
    
 
    
        
            101      <task id="73" name="Research name availability" parent="71" progress="0%" actual_start="2000.5.5 17.0" actual_end="2000.5.6 2.0" /> 
    
 
    
        
            102      <task id="74" name="Choose a Bank" parent="70" progress="0%" actual_start="2000.5.6 17.0" actual_end="2000.5.13 2.0" /> 
    
 
    
        
            103      <task id="75" name="Establish accounts" parent="74" progress="0%" actual_start="2000.5.6 17.0" actual_end="2000.5.10 2.0" /> 
    
 
    
        
            104      <task id="76" name="Establish line of credit" parent="74" progress="0%" actual_start="2000.5.12 17.0" actual_end="2000.5.13 2.0" /> 
    
 
    
        
            105      <task id="77" name="Choose legal representation" parent="70" progress="0%" actual_start="2000.5.12 17.0" actual_end="2000.5.13 2.0" /> 
    
 
    
        
            106      <task id="78" name="Select business tax-basis category" parent="70" progress="0%" actual_start="2000.5.13 17.0" actual_end="2000.5.15 2.0" /> 
    
 
    
        
            107      <task id="79" name="Choose capital funding source" parent="70" progress="0%" actual_start="2000.5.15 17.0" actual_end="2000.5.17 2.0" /> 
    
 
    
        
            108      <task id="80" name="Commit capital funding" parent="70" progress="0%" actual_start="2000.5.17 2.0" actual_end="2000.5.17 2.0" /> 
    
 
    
        
            109      <task id="81" name="Establish the Operating Control Base" parent="70" progress="19%" actual_start="2000.5.19 0.0" actual_end="2000.6.11 0.0" /> 
    
 
    
        
            110      <task id="82" name="Choose and set up the accounting system" parent="81" progress="0%" actual_start="2000.5.19 17.0" actual_end="2000.5.21 2.0" /> 
    
 
    
        
            111      <task id="83" name="Obtain required licenses and permits" parent="81" progress="38%" actual_start="2000.5.21 0.0" actual_end="2000.6.1 0.0" /> 
    
 
    
        
            112      <task id="84" name="Obtain needed insurance" parent="81" progress="0%" actual_start="2000.6.3 17.0" actual_end="2000.6.7 2.0" /> 
    
 
    
        
            113      <task id="85" name="Establish security plan" parent="81" progress="0%" actual_start="2000.6.7 17.0" actual_end="2000.6.11 2.0" /> 
    
 
    
        
            114      <task id="86" name="Develop Marketing Program" parent="70" progress="0%" actual_start="2000.5.5 17.0" actual_end="2000.5.9 2.0" /> 
    
 
    
        
            115      <task id="87" name="Establish an advertising program" parent="86" progress="0%" actual_start="2000.5.5 17.0" actual_end="2000.5.7 2.0" /> 
    
 
    
        
            116      <task id="88" name="Develop a logo" parent="86" progress="0%" actual_start="2000.5.7 17.0" actual_end="2000.5.8 2.0" /> 
    
 
    
        
            117      <task id="89" name="Order promotional materials" parent="86" progress="0%" actual_start="2000.5.8 17.0" actual_end="2000.5.9 2.0" /> 
    
 
    
        
            118      <task id="90" name="Provide Physical Facilities" parent="68" progress="16%" actual_start="2000.6.11 0.0" actual_end="2000.7.24 0.0" /> 
    
 
    
        
            119      <task id="91" name="Secure operation space" parent="90" progress="0%" actual_start="2000.6.11 17.0" actual_end="2000.6.18 2.0" /> 
    
 
    
        
            120      <task id="92" name="Select computer network hardware" parent="90" progress="100%" actual_start="2000.6.18 17.0" actual_end="2000.6.19 2.0" /> 
    
 
    
        
            121      <task id="93" name="Select computer software" parent="90" progress="0%" actual_start="2000.6.19 17.0" actual_end="2000.6.20 2.0" /> 
    
 
    
        
            122      <task id="94" name="Establish utilities" parent="90" progress="67%" actual_start="2000.6.21 0.0" actual_end="2000.6.26 0.0" /> 
    
 
    
        
            123      <task id="95" name="Provide furniture and equipment" parent="90" progress="15%" actual_start="2000.6.26 0.0" actual_end="2000.7.1 0.0" /> 
    
 
    
        
            124      <task id="96" name="Move in" parent="90" progress="13%" actual_start="2000.7.23 0.0" actual_end="2000.7.24 0.0" /> 
    
 
    
        
            125      <task id="97" name="Provide Staffing" parent="68" progress="30%" actual_start="2000.5.19 0.0" actual_end="2000.7.23 0.0" /> 
    
 
    
        
            126      <task id="98" name="Interview and test candidates" parent="97" progress="43%" actual_start="2000.5.19 0.0" actual_end="2000.6.7 0.0" /> 
    
 
    
        
            127      <task id="99" name="Hire staff" parent="97" progress="10%" actual_start="2000.6.7 0.0" actual_end="2000.6.21 0.0" /> 
    
 
    
        
            128      <task id="100" name="Train staff" parent="97" progress="31%" actual_start="2000.7.1 0.0" actual_end="2000.7.23 0.0" /> 
    
 
    
        
            129      <task id="102" name="Mau & Ago business" parent="97" progress="40%" actual_start="2000.1.24 0.0" actual_end="2000.2.2 0.0" /> 
    
 
    
        
            132      <connector type="FinishStart" from="69" to="72" /> 
    
 
    
        
            133      <connector type="FinishStart" from="46" to="49" /> 
    
 
    
        
            134      <connector type="FinishStart" from="45" to="46" /> 
    
 
    
        
            135      <connector type="FinishStart" from="25" to="28" /> 
    
 
    
        
            136      <connector type="FinishStart" from="24" to="25" /> 
    
 
    
        
            137      <connector type="FinishStart" from="99" to="100" /> 
    
 
    
        
            138      <connector type="FinishStart" from="98" to="99" /> 
    
 
    
        
            139      <connector type="FinishStart" from="95" to="96" /> 
    
 
    
        
            140      <connector type="FinishStart" from="94" to="95" /> 
    
 
    
        
            141      <connector type="FinishStart" from="93" to="94" /> 
    
 
    
        
            142      <connector type="FinishStart" from="92" to="93" /> 
    
 
    
        
            143      <connector type="FinishStart" from="91" to="92" /> 
    
 
    
        
            144      <connector type="FinishStart" from="80" to="82" /> 
    
 
    
        
            145      <connector type="FinishStart" from="79" to="80" /> 
    
 
    
        
            146      <connector type="FinishStart" from="79" to="82" /> 
    
 
    
        
            147      <connector type="FinishStart" from="79" to="98" /> 
    
 
    
        
            148      <connector type="FinishStart" from="78" to="79" /> 
    
 
    
        
            149      <connector type="FinishStart" from="77" to="78" /> 
    
 
    
        
            150      <connector type="FinishStart" from="67" to="69" /> 
    
 
    
        
            151      <connector type="FinishStart" from="66" to="67" /> 
    
 
    
        
            152      <connector type="FinishStart" from="65" to="66" /> 
    
 
    
        
            153      <connector type="FinishStart" from="64" to="65" /> 
    
 
    
        
            154      <connector type="FinishStart" from="63" to="64" /> 
    
 
    
        
            155      <connector type="FinishStart" from="62" to="63" /> 
    
 
    
        
            156      <connector type="FinishStart" from="61" to="62" /> 
    
 
    
        
            157      <connector type="FinishStart" from="60" to="61" /> 
    
 
    
        
            158      <connector type="FinishStart" from="59" to="60" /> 
    
 
    
        
            159      <connector type="FinishStart" from="58" to="59" /> 
    
 
    
        
            160      <connector type="FinishStart" from="57" to="58" /> 
    
 
    
        
            161      <connector type="FinishStart" from="56" to="57" /> 
    
 
    
        
            162      <connector type="FinishStart" from="55" to="56" /> 
    
 
    
        
            163      <connector type="FinishStart" from="54" to="55" /> 
    
 
    
        
            164      <connector type="FinishStart" from="53" to="54" /> 
    
 
    
        
            165      <connector type="FinishStart" from="52" to="53" /> 
    
 
    
        
            166      <connector type="FinishStart" from="51" to="52" /> 
    
 
    
        
            167      <connector type="FinishStart" from="50" to="51" /> 
    
 
    
        
            168      <connector type="FinishStart" from="49" to="50" /> 
    
 
    
        
            169      <connector type="FinishStart" from="44" to="45" /> 
    
 
    
        
            170      <connector type="FinishStart" from="43" to="44" /> 
    
 
    
        
            171      <connector type="FinishStart" from="42" to="43" /> 
    
 
    
        
            172      <connector type="FinishStart" from="40" to="42" /> 
    
 
    
        
            173      <connector type="FinishStart" from="39" to="40" /> 
    
 
    
        
            174      <connector type="FinishStart" from="38" to="39" /> 
    
 
    
        
            175      <connector type="FinishStart" from="37" to="38" /> 
    
 
    
        
            176      <connector type="FinishStart" from="36" to="37" /> 
    
 
    
        
            177      <connector type="FinishStart" from="35" to="36" /> 
    
 
    
        
            178      <connector type="StartStart" from="33" to="35" /> 
    
 
    
        
            179      <connector type="FinishStart" from="32" to="33" /> 
    
 
    
        
            180      <connector type="FinishStart" from="31" to="32" /> 
    
 
    
        
            181      <connector type="FinishStart" from="30" to="31" /> 
    
 
    
        
            182      <connector type="FinishStart" from="28" to="29" /> 
    
 
    
        
            183      <connector type="StartStart" from="28" to="35" /> 
    
 
    
        
            184      <connector type="FinishStart" from="23" to="24" /> 
    
 
    
        
            185      <connector type="FinishStart" from="22" to="23" /> 
    
 
    
        
            186      <connector type="FinishStart" from="21" to="22" /> 
    
 
    
        
            187      <connector type="FinishStart" from="19" to="20" /> 
    
 
    
        
            188      <connector type="FinishStart" from="18" to="19" /> 
    
 
    
        
            189      <connector type="FinishStart" from="17" to="18" /> 
    
 
    
        
            190      <connector type="FinishStart" from="15" to="21" /> 
    
 
    
        
            191      <connector type="FinishStart" from="14" to="15" /> 
    
 
    
        
            192      <connector type="FinishStart" from="13" to="14" /> 
    
 
    
        
            193      <connector type="FinishStart" from="12" to="13" /> 
    
 
    
        
            194      <connector type="FinishStart" from="12" to="17" /> 
    
 
    
        
            195      <connector type="FinishStart" from="10" to="12" /> 
    
 
    
        
            196      <connector type="FinishStart" from="9" to="10" /> 
    
 
    
        
            197      <connector type="FinishStart" from="8" to="9" /> 
    
 
    
        
            198      <connector type="FinishStart" from="7" to="8" /> 
    
 
    
        
            199      <connector type="FinishStart" from="5" to="7" /> 
    
 
    
        
            200      <connector type="FinishStart" from="4" to="5" /> 
    
 
    
        
            201      <connector type="FinishStart" from="3" to="4" /> 
    
 
    
        
            202      <connector type="FinishStart" from="89" to="91" /> 
    
 
    
        
            203      <connector type="FinishStart" from="88" to="89" /> 
    
 
    
        
            204      <connector type="FinishStart" from="87" to="88" /> 
    
 
    
        
            205      <connector type="FinishStart" from="85" to="91" /> 
    
 
    
        
            206      <connector type="FinishStart" from="84" to="85" /> 
    
 
    
        
            207      <connector type="FinishStart" from="83" to="84" /> 
    
 
    
        
            208      <connector type="FinishStart" from="82" to="83" /> 
    
 
    
        
            209      <connector type="StartStart" from="76" to="77" /> 
    
 
    
        
            210      <connector type="FinishStart" from="75" to="76" /> 
    
 
    
        
            211      <connector type="StartStart" from="75" to="77" /> 
    
 
    
        
            212      <connector type="FinishStart" from="73" to="75" /> 
    
 
    
        
            213      <connector type="StartStart" from="73" to="87" /> 
    
 
    
        
            214      <connector type="FinishStart" from="72" to="73" />